
The wall is removed and the ceiling is down. The stuff on the floor is the cellulose insulation which was the messiest and dirtiest part of the job. It went everywhere and had to be removed slowly in buckets.
The skylights went in and flooded the room with light. New insulation is now in place .

Went with the electrician to a lighting store and selected gallery style track lighting. Also planned power outlets and will be having 12 double points. That is 24 outlets in the one room. Do you think I will have enough?

Tomorrow - ceiling and plaster!
I have been playing around with the floor plan and scale shapes of everything that I am trying to fit in. Even though this studio is bigger than anything I have had before - I am still struggling to fit it all in but it will all be fine in the end.